Case Study: Bentofix® Waterproofing
Construction Date: 2003
Location: Windlesham, Surrey, UK
Products: Bentofix® BFG 5000 Bentostrip Waterstop
General Information
One of the worlds largest pharmaceutical companies Eli Lilley is extending its facility at Windlesham near London in the U.K. The scheme comprises new research laboratories of 15,352 m² and includes ancillary offices. They are demolishing 3,869m² of the present building. Car parks, access roads and services are also included in the scheme.
The Architect RMJM of London specified a conventional “peel and stick” waterproofing system for all the below ground waterproofing. The successful main contractor, The Wates Group, in discussion with Naue Geosynthetics Limited proposed an alternative system utilising the Naue Bentofix® BFG 5000 membrane and Bentostrip Waterstops.
The concrete frame is being constructed by P.P. Construction of Reading, U.K. and they agreed to use the Naue products instead of the specified system. The project involves the placing of 16,000m² of Bentofix® BFG 5000 and approximately 1,000 Linear metres of Waterstops. Naue Geosynthetics have supplied alternative waterproofing details and trained the site operatives to install the membrane. The contractor has noted the ease of installation. The speed with which they are progressing with the waterproofing has meant that the contract is ahead of schedule at this crucial early stage.